BCT week 3 monday



On Monday I got to work on the stair well opening in my floor section.  I started out by laying the full length inside joist so that I would be able to through nail them into the outside header.  I then through nailed the outside header into the tail joist and then applied the inside header.  It is not pictured above but 2 more full length joist were added to the opening on the outside to give it more strength.

Comments

  1. Remember the post title is Week 3. The first two photos would be labeled Monday, then two for Wednesday, finally two for Friday. I am looking for concise descriptions of how/why for each photo. Your entry above starts to address this, you just need to be consistent for an entire week.
    Normal Blog grade would of been 70. First Blog grade given is 80. See me if you have questions.