BCT 143 week 1 Friday (Maybe Week 4)
In the first picture you can see our chalk line was put onto the floor system in preparation for the floor sheathing. we marked the line 4 feet from the end where the two sheets will connect.
The second picture on the bottom is the blocking that we installed that will go bellow the 4x4 skids. Blocking will help secure the skids to the floor system. the skids themselves which are not pictured above are used to to create space for something to pick up the shed once built. They also prevent damage to the floor while moving it around.