BCT 143 week 2 friday (Maybe Week 6)


In the first picture you can see our chalk line is done again on the floor system to make sure we are still squared and to also give us line for our wall to sit on.  the line has to be within 3 1/2" inches from the end to make sure the sheathing for the wall will be flush with the whole entire system.


The second picture shows the wall in progress.  the studs are placed 16" OC from the end and is almost ready for sheathing.  first the wall must be secured to the floor system before sheathing can be applied.  this helps the wall stay squared while hammering in nails.